|
Basements needing Bathrooms |
Basement projects require breaking
up the concrete floor to install or modify plumbing drains. |
Go Back |
Using a small electric jackhammer to break up the concrete.. | All dug out and 2" drain lines in.. |
A lot of digging.. | 3" Pipe and toilet flange.. |
Drain and vent for a vanity.. | Backfilled and cementing over.. |
Cemented over.. | Cemented over.. |
Framing done with mold resistant blue studs.. | Tub is in.. the rest of the floor gets Keisel leveling cement! |
Durock cement board and Kerdi Band on the seams.. | Finished product .. |
Busting up floors for drain pipes.. | Drain pipes in and cemented over.. |
Kerdi waterproof membrane on the walls.. | A unique Fresca toilet.. |
home | request for service or a quote | what we do | past projects | about us |